Costs & budgets

How Much Does a New Deck Cost in Austin?

A useful deck budget starts with foundations, framing, decking and the features you will use. Board prices alone leave out much of the work needed for a finished deck.

Our base planning ranges

For October 2026 planning, our straightforward low-deck ranges are $42–$55 per square foot for pressure-treated construction, $58–$75 for value composite, $65–$85 for mid-range composite and $75–$95 for premium composite. These are ATX Deck & Patio planning allowances, not independently measured Austin market averages.

The base assumes a deck up to 30 inches high with normal access, standard pressure-treated framing, decking, hardware and basic concrete footings. Installation and project costs include labor, management, overhead and profit; materials are a purchase allowance without a material markup.

What a 200 sq ft example means

At the base rates, a 200 sq ft pressure-treated deck represents $8,400–$11,000. A mid-range composite deck of the same area represents $13,000–$17,000. Both use the same simple site assumptions so you can compare materials.

These examples exclude stairs, railing, demolition, raised-deck work, difficult access, sales tax, delivery, permits, engineering, staining, rock excavation and unusual foundation work. Small-project minimums may change the effective per-square-foot price.

Why equal-size decks can cost differently

A low rectangular deck with easy access is different from a raised deck on a slope with long stairs and substantial railing. The same surface area can require very different supports, connections and working conditions.

Custom borders, diagonal boards and multiple levels can change labor and waste. Describe these features when requesting a budget; a single price per square foot cannot represent every design.

Choose a complete material option

Compare the named board series and color, fascia, fasteners and railing. A value composite quote should not be compared directly with a premium collection as though the specification were identical.

Pressure-treated wood can reduce the initial investment; composite reduces routine sanding and staining needs. Both need appropriate care and a sound frame. Read our Trex and TimberTech comparison before choosing a composite tier.

Turn the budget into a usable estimate

Gather approximate dimensions, photographs, the height at the outside edge and your preferred material. Note whether an old deck needs removal and where the crew can access the backyard.

Use our Austin new deck cost calculator for a starting comparison. A site visit confirms foundations, access, scope and exclusions. For replacing a structure, see our deck rebuild budgeting guide.